Despite all challenges, SumDU is getting closer to recovery every day. This week is yet another proof of the unbreakable will of staff and partners who are working together to restore the damaged buildings.
In particular, the Congress Center roof was repaired over an area of 30 m². Besides, the next stage of construction waste removal was carried out. This week, 20 m³ was removed, bringing the total volume to over 290 m³ since the recovery start.
Two new windows and one double-leaf interior door have been installed in Academic Building 2.
SumDU keeps recovering. The work is being carried out in a timely manner and in accordance with technical requirements to provide a safe and comfortable learning environment for students and staff as quickly as possible.