Over the past week, active work has been continued at SumDU to repair the damage caused by the missile attack.
In Academic Building 2, 16 windows have been replaced and repairs are underway on Armstrong-type suspended ceilings. Besides, State Emergency Service specialists dismantled damaged roof structures covering an area of approximately 100 m².
In Academic Building 3, repairs were completed on 16 windows damaged by the blast wave.
Repairs to the roof of the Congress Center continue: 150 m² of the old roofing has been dismantled and installation of new supporting structures has begun.
This week, 20 m³ of construction debris was also removed. The total volume of debris dismantled and removed since the start of restoration has exceeded 370 m³.
SumDU thanks everyone who is involved in the reconstruction and restores the university functionality and safety.